A few days ago, Zhejiang issued a notice on further strengthening the environmental management of industrial solid waste. The full text is as follows:
Zhejiang Provincial Department of Ecology and Environment
Zhejiang Huanfa [2019] No. 2
Zhejiang Provincial Department of Ecology and Environment
Notice on Environmental Management of Industrial Solid Waste
Municipal, county (city, district) ecological environment bureau:
To implement the "Notice of the General Office of the People's Government of Zhejiang Province on Printing and Distributing the Implementation Plan for the Clean Waste in Zhejiang Province" (Zhejiang Zhengfa [2018] No. 86, hereinafter referred to as the "Demolition Action Plan"), accelerate the improvement of industrial solid waste The closed-loop management of source control, collection and transshipment, capacity building, stock clearing, and law enforcement supervision are now further strengthened as follows:
I. Further promote the refinement of source control
(1) Strengthening the management of solid waste in construction projects. When preparing the environmental impact assessment report of a construction project, the environmental impact assessment agency shall thoroughly analyze the production link, type, quantity, nature and hazard characteristics of the industrial solid waste, scientifically determine the nature of the waste or propose a proposal for identification; and analyze the use of the site for disposal. The feasibility of on-site resource reduction and reduction measures, evaluate the environmental impact of the disposal method, and propose corresponding countermeasures; for the commissioned use and disposal, the construction requirements of the storage site should be clarified, and the industrial solid waste should be entrusted to use. Analyze the way of disposal and the feasibility of going. The eco-environment departments at all levels must strictly examine and approve the projects that are difficult to dispose of industrial solid waste, generate large quantities, and cannot be disposed of locally.
(2) Guiding the source of the enterprise to reduce the amount. According to the requirements of the “Demolition Action Planâ€, enterprises with large industrial solid waste production are encouraged to strengthen the clean production process transformation, or carry out comprehensive utilization disposal on the site to effectively reduce the source of industrial solid waste. Encourage enterprises with an annual output of more than 5,000 tons of hazardous waste to self-build and use the disposal facilities and operate according to law.
(3) Comprehensively verifying the production of industrial solid waste. The eco-environment departments at all levels shall conscientiously implement the industrial solid waste declaration and registration system, supervise and urge the industrial solid waste generating units within the jurisdiction to implement the main responsibility for the prevention and control of solid waste pollution, and carry out the verification of the production of industrial solid waste on an annual basis. The contents of the verification include: the actual amount of solid waste generated, the type, the main pollutant component, the feasibility of using the disposal method, the storage capacity of the enterprise and the storage standardization. The verification results are reported to the local ecological environment department, and are reported as enterprise registration and hazardous waste management. Support for industrial solid waste management such as planning and filing. If the ecological and environmental departments at all levels find that the contents of the verification report are not true or the verification results are incorrect in the post-event supervision, they shall urge the enterprise to resume verification.
(4) Standardizing the identification of solid waste. The technical institutions that undertake the identification of solid waste according to laws and regulations shall strictly follow the "National Hazardous Waste List" (2016 version), the "Solid Waste Identification Standards - General Principles" (GB34330-2017), and the "Hazardous Waste Identification Standards - General Principles" (GB5085) .7-2007) and relevant standards and standards for the identification of hazardous wastes, carry out solid waste identification work, determine the solid waste properties or dangerous characteristics of substances through identification schemes, sampling and testing, and issue identification reports. The identification report conclusion can be used as Generate the basis for the environmental management of the substance. Where relevant laws, regulations or standards are subject to adjustment and revision, they shall be prescribed.
Second, further promote the specialization of the collection process
(1) Focus on solving the difficult problem of collecting hazardous wastes from small and micro-production waste enterprises. Cultivate a professional service team and establish a sound service system. According to the "Demolition Action Plan", localities can set up collection facilities in the counties (cities, districts) through the business units, and uniformly construct storage facilities in the parks, and counties (cities, districts). The government plans to plan and unify the services in a unified manner, and strives to solve the problem that the collection and transportation of hazardous wastes in small and micro-production waste enterprises are not timely and the disposal is not smooth. Carry out pilot projects for the establishment of pre-processing points in various localities, and encourage business units to establish pre-processing points with experimental analysis and pre-processing capabilities through self-authorization or cooperation with third parties, and establish a working mode of integration of the receiving and transportation offices. Where all counties (cities, districts) governments make overall plans for unified service methods, specific work plans shall be formulated and implemented according to law. The unified service unit shall assist the small and micro-production waste enterprises to carry out relevant management such as declaration and registration, management plan filing, transfer of joint orders, and information system filing.
(2) Strengthening the management of transshipment management and inter-provincial transfer. Effectively strengthen the risk prevention and control of the transportation process, and strictly control long-distance transportation. The general industrial solid waste is not approved without approval. The waste denitration catalyst, copper sludge, waste engine oil in hazardous wastes and other provinces have corresponding utilization capacity and surplus. A large amount of non-province; waste lead storage batteries, domestic waste incineration fly ash, waste salt, mercury-containing wastes and other inadequacies in the use of disposal capacity. For hazardous wastes transferred across provinces, the sub-component approval shall be carried out according to the operating capacity of the hazardous waste utilization and disposal units in the jurisdiction and the actual disposal situation in the previous year to ensure the standardized disposal and disposal of hazardous wastes in the province. To strengthen the coordination of hazardous waste utilization and disposal capacity in the province, it is strictly forbidden to artificially set up administrative barriers for hazardous wastes transferred across cities and counties to ensure legal transfer and fair competition across regions.
Third, further promote the matching of disposal capacity
(1) Broaden the comprehensive utilization channels of industrial solid waste. The eco-environment departments at all levels shall promote the industrial green development, supervise and urge relevant enterprises to actively carry out comprehensive utilization of industrial solid waste, and cooperate with development and reform, and the Ministry of Economics and other departments to broaden the comprehensive utilization of large-scale industrial solid waste such as coal ash slag, smelting waste residue and industrial by-product gypsum. channel. Use the products produced by solid waste to meet the quality standards of the products produced by the corresponding substitute raw materials, and the content of harmful substances does not exceed the hazardous waste identification standards or relevant environmental emission indicators, and there are stable and reasonable market demands, which may not be used as solid waste management. .
(2) Promoting the improvement of the disposal capacity of industrial solid waste. All localities should promote the main responsibility of the party committee and government to implement the construction of solid waste disposal facilities. It should meet the requirements of the principle of “general solid waste does not leave the county, hazardous waste does not go out of the marketâ€, and combine the production and disposal capacity of industrial solid waste in its jurisdiction. In fact, it proposes countermeasures for the construction of industrial solid waste disposal facilities to ensure the safe disposal of industrial solid waste. Adjust and optimize the construction plan of hazardous waste disposal facilities in the province, accelerate the construction of hazardous waste disposal and utilization capacity, and basically achieve the matching of the production capacity of hazardous wastes in the urban area by the year 2020, and achieve the main capacity within the urban area by 2022. There is a large surplus of hazardous waste utilization and disposal capacity. Vigorously promote the co-disposal of hazardous waste projects in cement kilns, and explore the implementation of a coal-fired power plant co-disposal sludge and steel plant collaborative disposal of heavy metal sludge pilot project.
(3) Implementing the improvement and improvement actions of the hazardous waste utilization and disposal industry. Actively carry out remediation of hazardous waste utilization and disposal units, using waste acid, waste mineral oil, waste emulsion, waste packaging materials, and disposal of heavy metal-containing wastes, enterprises self-burning and centralized incineration disposal, and utilization and disposal through hazardous waste exemption management. Focusing on the field, we will speed up the elimination of backwardness, such as backward technological level, poor operational stability, and low load rate, and achieve the goal of “reorganizing and eliminating batches, upgrading and upgrading a batch, and standardizing managementâ€. Promote the formation of a number of high-standard, large-scale, first-class hazardous waste disposal facilities demonstration projects, give priority to supporting the reconstruction and expansion of demonstration projects, give policy inclinations in the aspects of environmental impact assessment and project landing, and focus on cracking the "neighborhood of hazardous waste disposal facilities construction projects" Avoid the effect, and effectively improve the level of cleanliness and standardization of disposal facilities.
Fourth, further promote the stock clearing dynamic
(1) Improve the informationization level of the zeroing work. Make full use of big data and information technology to build a provincial solid waste supervision information system, dynamically grasp the generation and storage information of hazardous waste, accelerate the electronic management of solid waste management accounts, transfer joint orders, and disposal funds to achieve solid waste. The whole process of “from cradle to grave†tracks supervision.
(2) The main responsibility of compacting and zeroing work. Strictly implement the work of “dynamic clearing†of industrial solid waste, especially the main responsibility of the producers, establish a coordination mechanism for hazardous waste disposal resources in the province, implement the “one factory, one policy†classification and disposal plan, and implement the zero settlement of the stock hazardous waste. Disposal work, standardize and clear at the same time of dynamic clearing.
V. Further promote the normalization of high pressure and strict pipe
(1) Strengthen the supervision of the whole process of industrial solid waste. Strengthen the closed-loop management of logistics and capital flow, and actively explore the establishment of a unified settlement platform for the utilization of industrial solid waste. If the industrial solid waste generating unit directly delivers the disposal cost to the transport unit or individual to entrust it with full authority, it shall conduct key supervision and inspection according to law. Encourage the third-party audit institutions to conduct a sample audit of the production, transfer, utilization and disposal of key industrial solid wastes through government procurement of services, and strive to improve the level of supervision. Accelerate the construction of video surveillance systems for the “three points and one line†of the entrances and exits, storage places and production (disposal) facilities of hazardous waste generation and disposal enterprises.
(2) Further increase law enforcement efforts. All localities should implement the routine law enforcement duties on industrial solid waste and implement industrial solid waste in accordance with the "Notice on Resolutely Curbing the Illegal Transfer of Solid Wastes and Dumping to Further Strengthen the Supervision of the Whole Process of Hazardous Wastes" (Environmental Office Letter [2018] No. 266) Incorporate into the “double random†environmental law enforcement plan, and cooperate with the standardized management assessment of hazardous waste. Further strengthen the coordination between administrative law enforcement and criminal justice, and crack down on crimes of illegal dumping of solid waste to pollute the environment, and implement "zero tolerance" for illegal activities of solid waste. We will work together to implement a system of severe punishment and severe punishment, explore the establishment of an industry blacklist system, and ban the illegal personnel in the industry, so that operators with major environmental violations “one time illegal, limited everywhereâ€, greatly increase their environmental illegal costs, purification Industry operating environment.
(3) Creating a high-pressure and strict management of the social atmosphere. Strengthen the publicity and education of solid waste policies and regulations, establish an information disclosure system, and urge relevant enterprises to disclose relevant information such as the amount and disposal of solid waste to the public. We will improve the channels for complaints and reports on illegal solid waste cases, vigorously promote the system of reporting and reporting of solid wastes, and mobilize the masses, improve the public supervision system, and create a good atmosphere for participation by the whole people. Actively carry forward positive examples, promptly disclose cases of typical crimes in the field of solid waste, and demonstrate the firm determination of protecting the ecological environment and the health of the people through the case, creating a high-pressure law enforcement situation, deterring environmental criminals, and effectively protecting solid waste. environment safety.
This notice shall come into force on February 15, 2019.
Contact: Department of Provincial Ecology Environment Dai Dai; telephone.
Zhejiang Ecological Environment Department
January 11, 2019
Interpretation of the Policy of the Zhejiang Provincial Department of Ecology and Environment on Further Strengthening the Environmental Management of Industrial Solid Wastes
The Circular on Further Strengthening the Environmental Management of Industrial Solid Wastes (hereinafter referred to as the “Noticeâ€) has been issued and the relevant issues are now read as follows:
I. Drafting background
Since the 18th National Congress of the Communist Party of China, the central government has taken solid waste pollution prevention and control work as a key task of ecological environmental protection, and its efforts have been continuously increased. The party’s 19th National Congress will strengthen the supervision of solid waste disposal and pollution of gas, water and soil. Prevention and control have reached the same level, and the prevention and control of solid waste pollution has entered the main battlefield of ecological civilization construction. The provincial party committee and the provincial government also attach great importance to this work. Since 2013, the "Opinions of the General Office of the People's Government of Zhejiang Province on Further Strengthening the Supervision of Hazardous Waste and Sludge Disposal" (Zhejiang Zhengfa [2013] No. 152), Notice of the General Office of the People's Government of Zhejiang Province on Printing and Distributing the Three-Year Action Plan for the Supervision and Administration of Hazardous Waste Disposal in Zhejiang Province (2016-2018) (Zhejiang Zhengfa [2016] No. 13), which was the first in the country on August 24 this year. The issuance of the "Zhejiang Province Waste Disposal Action Plan" (Zhejiang Administration Office [2018] No. 86) (hereinafter referred to as the "Demolition Action Plan") has opened a new chapter in the prevention and control of solid waste pollution in our province. In order to effectively implement the "Demolition Action Plan" and further clarify the specific requirements of the various tasks in the "Demolition Action Plan", this "Notice" is specially formulated.
Second, the main content
The "Notice" has five major paragraphs, mainly focusing on the principle of "fine control of source control, specialization of collection and transportation process, matching of disposal capacity, dynamics of inventory clearing, and normalization of high pressure and strict pipe" for industrial solid waste management. Specific requirements for the generation, collection, use and disposal of waste and regulatory enforcement.
The first paragraph is to further promote the refinement of source control. It is mainly the specific requirements for the production of industrial solid waste, including strengthening the source management of solid waste in construction projects, guiding the reduction of source of enterprises, comprehensively verifying the production of industrial solid waste, and standardizing the identification of solid waste. That is, the requirements of “control source, reduction, clear source, and qualitativeâ€.
The second paragraph is to further promote the specialization of the collection process. It is mainly the specific requirements for the collection and transportation of industrial solid waste, including efforts to solve the difficult problem of collecting hazardous wastes in small and micro enterprises, strengthening transshipment management and cross-province transfer approval. The main purpose is to solve the outstanding problems of small and micro enterprises collecting difficulties through innovative system design. The second is to strictly control long-distance transportation, strictly transfer inspections across provinces, and realize the near disposal of industrial solid waste.
The third paragraph is to further promote the matching of disposal capabilities. It is mainly for the specific requirements of the industrial solid waste utilization and disposal, including the expansion of industrial solid waste comprehensive utilization channels, the promotion of industrial solid waste disposal capacity improvement, and the implementation of hazardous waste utilization and disposal industry improvement actions. By encouraging the comprehensive utilization of industrial solid waste and implementing the “quantity and quality upgrade†of industrial solid waste utilization and disposal capacity, we will speed up the realization of the disposal capacity to meet the principle requirements of “general solid waste does not leave the county, hazardous waste does not go out of the marketâ€, and improve the disposal capacity. At the same time, improve the technical equipment and standardized management level of the disposal facilities.
The fourth paragraph is to further promote the dynamics of stock clearing. It mainly proposes specific requirements for the clearing of industrial solid waste, including the improvement of the informationization level of the zeroing work and the main responsibility of the compaction and zeroing work. It aims to achieve zero clearing in the specification while realizing dynamic clearing by means of informationization means and the main responsibility of the producer.
The fifth paragraph is to further promote the normalization of high pressure and strict pipe. It mainly puts forward specific requirements for safeguards such as supervision and enforcement, including strengthening the supervision of the whole process of industrial solid waste, further strengthening law enforcement, and creating a high-pressure and strict social atmosphere. It mainly puts forward the requirements of logistics and capital flow management requirements, strengthens law enforcement to construct severe punishment and severe punishment system, and perfects the public supervision system.
This article is posted on this website for the purpose of transmitting more information and does not imply endorsement of its views or confirmation of its description.
Article source address: http://
Moisturizing Mask,Cleansing Mask,Anti Wrinkle Mask,Whitening Mask,Tencel mask
Guangzhou cosmeceuticals daily chemicals PTY,.LTD. , https://www.gzcosmetics.com